The problem this replaces
Designing the utility backbone of an advanced-manufacturing facility is one of the most complex data problems in construction. Thousands of tools, panels, and connection points — and on most builds, that data lives scattered across dozens of spreadsheets, passed between owner, designers, and trades, with no proper version control and no single source of truth. Every revision is a copy; every copy drifts.
FacilityConnect changes this: one living model that every change writes into. And the bridge from today’s world into that model is deliberately familiar — an Excel import. The workbooks your team already maintains are the way in.
What migration gets you
- One source of truth. Owner, designers, and trades read the same current fact of the model — not the newest copy of a copy.
- Your workbooks are the format. The spreadsheet you maintain today is the spreadsheet FacilityConnect reads — and re-importing it later updates the model instead of duplicating it.
- Connected, not just stored. Panels land as a hierarchy, circuits become connection points at real coordinates, and demands are matched to them with computed distances — reviewable, never silent.
- Configured from day one. Projects start from your organization template: disciplines, utility types, buildings, and custom fields arrive pre-set.
How migration works
- Send the two workbooks. The panel schedule and the tool list, as they are — our engineers map your columns onto the import template.
- We import and connect. Exactly what the walkthrough above shows: panels, tools, assignments, live in the 3D viewer.
- You work against the living model. When the tool list changes, the update is another upload — not another data-entry campaign.